20 questions, 5 per domain. No account needed.
1. A risk owner implements a planned mitigation, reducing a server-crash risk from high to low, but notices the backup server introduces a new data-sync risk. Where should this new risk be recorded?
2. A project team assumed the client's data center had redundant power feeds, so they omitted a backup generator from the budget. During site inspection, engineers find only a single feed. What has happened?
3. Which characteristic distinguishes ongoing operations from a project?
4. Which statement BEST distinguishes an output from a benefit?
5. A usually vocal QA lead goes quiet during three consecutive sprint reviews after her defect warnings were dismissed. How should an emotionally intelligent project manager respond?
6. A city museum is renovating its archival vault. The team has finished decomposing the scope into work packages in the WBS, including Work Package 3.2 (Fire-Suppression Piping). Next, the scheduler needs to identify the specific actions—such as core-drilling, pipe hanging, and hydrostatic pressure testing—that will be sequenced and estimated for duration. Which process is the team performing now?
7. A PM wants a team to list the specific activities needed for each process in a predictive project. Which activity is an example of Define Activities (5.7)?
8. On a commercial glassworks annealing-lehr rebuild, the original Performance Measurement Baseline (PMB) scheduled Planned Value (PV) of $80,000 through Month 4. Midway through Month 4, the Change Control Board (CCB) approves a scope change that adds $12,000 of work scheduled in Month 4, raising cumulative PV through Month 4 to $92,000. At the end of Month 4, Earned Value (EV) is $87,400 (including $9,400 from the approved change) and Actual Cost (AC) is $90,000. Using the updated baseline, what are the project’s Schedule Variance (SV) and Schedule Performance Index (SPI), and what do they indicate?
9. A trailhead restroom building project reports PV = $84,000, EV = $90,000, and AC = $96,000. Round indexes to two decimals. Which statement correctly documents project status?
10. A team lists 'commissioned ferry-dock pier' as an output the customer will accept. Which project component is it?
11. Which role orders the product backlog and sets its priorities?
12. Under cost-of-delay prioritization, which backlog item rises highest in order?
13. On a law-firm conflict-check tool, an item's functional acceptance criteria pass, but the team discovers that a security scan required by its Definition of Done was skipped. What should the team do?
14. A single team of seven builds one mobile app for an orchard's online shop, with no dependencies on other teams. Leadership asks whether to adopt the full SAFe® framework. What is the most sensible view?
15. Midway through a Sprint, the Developers on an apartment-maintenance request app see that two of the five selected items will not fit. The Sprint Goal can still be met with the other three. What is the best action?
16. What does a process manager primarily do on a project or in an operation?
17. Surveys, two workshops, and an interview all report that field crews need offline mode, but the sponsor says it exceeds the budget. Which analysis best handles this conflict?
18. A sponsor adds five requirements mid-project with no added funding, and the scope baseline is never updated. Which PGPG process should have governed these additions?
19. Two delivery teams in different time zones must agree on an interface change this week. Which channel best fits?
20. A stakeholder asks to add a requirement mid-sprint for a mobile donation feature. The product owner has no capacity change. What is the best response?